Top








vve viltroos

old construction 1991 | 87 m2 | 2011-12

design, implementation guidance

location amsterdam

 

The hall (including elevator, stairs, lighting, intercom, mailboxes and information board) was hard on a refurbishment. The walls were plastered and painted.

 

Each floor had its own color, which is on the ground coming back in five horizontal bands painted on the wall. The higher in the complex, the darker the color applied on the floor. The fourth floor has to be the only one (top) window, and so at all levels in proportion as much light. The front doors of each apartment will get a colored surface where the doorbell and house number are posted. Billboards falls off the wall and together with the panel with video intercom and mailboxes is aligned with the horizontal bands.

 

carpenter De Zoeten onderhoud

painter and stucco Yaman